Risks in total investment costs. Bases for the management of constructive investments
DOI:
https://doi.org/10.5377/farem.v0i38.11947Keywords:
Risks, total investment costs, constructive investmentsAbstract
Risk analysis considers a set of tools associated in a correlated way for each phase of its management that help the systematization of complex processes developed under uncertainties. Thus, it is feasible to use it in problems where uncertainties are present, so that its application in the total investment costs can help to estimate the contingencies in the constructive investments. From this perspective, a group of concepts associated with risk management are analyzed by means of statistical processors and social networks, which contribute to determine how this can be contextualized to the analysis of total investment costs through the determination of a set of phases and their corresponding activities. The result has made it possible to determine the phases of the process, its stages and the possible techniques and tools to be used when faced with the need to foresee actions to diminish the effect of unforeseen events on the total investment cost that will help in the construction of methodological instruments that facilitate the management of these unforeseen events, which constitute risks in any constructive investment.
Downloads
References
Acelay, C., (2018). Entendiendo los cambios “profundos” de la Guía del PMBOK® - Sexta Edición. Disponible en: https://www.academia.edu/38919311/Gu%C3%ADa_del_PMBOK_-6_Edici%C3%B3n_Entendiendo_los_cambios_profundos_de_la_Gu%C3%ADa_del_PMBOK_-Sexta_Edici%C3%B3n [Consultado el 7 de julio del 2019]
Akintoye A. y Malcolm J., (1997). Risk analysis and management in construction. International Journal of Project Management Vol. 15, No. 1, pp. 31-38. Elsevier Science Ltd and IPMA
Altez V., (2009). Asegurando el valor en proyectos de construcción: un estudio de técnicas y herramientas de gestión de riesgos en la etapa de construcción. Pontificia Universidad Católica del Perú. Disponible en http://http://tesis.pucp.edu.pe/repositorio/handle/20.500.12404/151 5753437 [Consultado el 5 de julio del 2016]
Ayodeji E., y Clinton O., (2017). Sustainable value management for construction proyect. Sprnger Editorial, Switserland. 195p
Borgatti, S., et.al., (2002). Ucinet for Windows: Software for Social Network Analysis. Harvard, MA: Analytic Technologies.
Committee of Sponsoring Organizations, COSO II, (2004). Gestión de Riesgos Corporativos – Marco Integrado: Técnicas de Aplicación. Disponible en: https://www.poder-judicial.go.cr/controlinterno/index.php/informacion-general-gestion-de-riesgos?download=95:coso-erm-riesgo-empresarial-tecnicas-de-aplicacion [Consultado el 8 de julio del 2018]
De La Fuente F., (2012). Análisis Conglomerados: Facultad de Ciencias Económicas y Empresariales, Universidad Autónoma de Madrid.
Dotres Z., (2016). Procedimiento para la evaluación de impactos en la ejecución de inversiones constructivas. Aplicación: hotel Ordoño, Gibara, Holguín. Tesis presentada en opción al título de Master en Contabilidad gerencial. Facultad de Ciencias Económicas y de Administración. Universidad de Holguín
Dotres Z., y Sánchez P., (2020). Integración de la responsabilidad social empresarial en la gestión del riesgo en la planeación y ejecución de inversiones constructivas. Revista Avances, 21(4), 394-404.
Dotres Zúñiga, Silvia (2016). Procedimiento para la evaluación de impactos en la ejecución de inversiones constructivas. Aplicación: hotel Ordoño, Gibara, Holguín. Tesis presentada en opción al título de Master en Contabilidad gerencial. Facultad de Ciencias Económicas y de Administración. Universidad de Holguín
DotresZuñiga, S., y KaterineAsencio (2011). Gestión de riesgos en la Dirección Integrada de Proyecto, aplicada a la rehabilitación del Hotel Ordoño en el núcleo urbano de Gibara, provincia Holguín. Tesis presentada en opción al título de Licenciado en Contabilidad y Finanzas. Facultad de Ciencias Económicas. Universidad de Holguín Oscar Lucero Moya.
Fonteboa V., (2015). Evaluación del riesgo y respuesta a los mismos, en las entidades cubanas. Revista Cubana De Ciencias Económicas-EKOTEMAS. Vol. 1, No. 3; septiembre-diciembre. 2015. 1-18pp
García, J; et al., (2010). Gestión de riesgos en proyectos de construcción. Primer congreso de ingeniería de proyectos. Mayo 2010, Antofagasta, Chile
Heredia, R. (1995). Dirección Integrada de Proyecto. Madrid, España: Sección de publicaciones de la Escuela Técnica Superior de Ingenieros Industriales de la Universidad Politécnica De Madrid.
ISO 31000, (2009). Gestión de Riesgos, Principios y Guías. Disponible en: http// www.isotools.cl/los-11-principios-de-la-iso-31000-la-gestion-de-riesgos. [Consultado el 17 de mayo del 2013]
ISO 31000, (2018). Gestión de Riesgos, Marco y Proceso-Directrices. Disponible en: https://es.scribd.com/document/391597334/iso31000-2018. [Consultado el 17 de mayo del 2019]
ISO 31010, (2019) Gestión de Riesgos: Técnicas de Evaluación de Riesgos. Disponible en: https://www.isotools.org/2019/09/04/iec31010-2019-tecnicas-evaluacion-gestion-riesgos/[Consultado el 14 de febrero del 2020]
Koprinarov, B., (2005). El riesgo empresarial y su gestión. Disponible en: http://www.analitica.com/va/economia/opinion/5753437 [Consultado el 5 de julio del 2016]
León B., (2018). Técnicas de Evaluación del Riesgo. Escuela Europea de excelencia. Disponible en: http://docplayer.es/95429629-Diplomado-gestion-del-riesgo-iso-31000-2015.html. [Consultado el 5 de julio del 2019]
León L. y Mariños L., (2014). Gestión de riesgos en el proyecto residencial Sol de Chan Chan. Tesis de grado: Universidad Privada Antenor Orrego, Trujillo, Perú Disponible en: http://repositorio.upao.edu.pe/handle/upaorep/613. [Consultado el 17 de julio del 2018]
Melo C., (2015). Gestión de riesgo. Teoría y práctica. Editorial Academia, La Habana, 290 p
Norma Española UNE-ISO 31 000, (2018). Gestión de riesgos. Directrices. Asociación Española de Normalización. Genova, Madrid, 26p
Norma Técnica Colombiana para la gestión del riesgo, NTC-IEC/ISO 31010, (2013). Gestión del riesgo. Técnicas de valoración del riesgo. Norma técnica colombiana. Instituto Colombiano de Normas Técnicas y Certificación (ICONTEC), Bogotá D.C
O’brien, S., (2018). Conference des grandes ecoles. Ecole de Ingenieruis. Disponible en:https:// www.cge.asso.fr/ecoles/istec/ [Consultado el 17 de julio del 2018]
Project Management Institute, PMI, (2013). A Guide to the Proyect Management. Body of Knowledge. Guía del PMBOK®. Quinta Edición, Pensilvania, Pp 597
Project Management Institute, PMI, (2017). A Guide to the Proyect Management. Body of Knowledge. Guía del PMBOK®. Sexta edición, Pensilvania, Pp 976
Real Academia Española, RAE, (2019). Diccionario de la Lengua Española. Disponible en: https://dle.rae.es/analis [Consultado el 17 de julio del 2018]
Real Academia Española, RAE, (2019a). Diccionario de la Lengua Española. Disponible en: https://dle.rae.es/estim [Consultado el 17 de julio del 2018]
Real Academia Española, RAE, (2019b). Diccionario de la Lengua Española. Disponible en: https://dle.rae.es/evalua [Consultado el 17 de julio del 2018]
Resolución No 60. Normas del Sistema de Control Interno de la República de Cuba (2011). Disponible en http://www.fgr.gob.cu/sites/default/files/Resolucion%2060.pdf [Consultado el 20 de julio del 2012]
Salas Z., (2016). Estudio de la incidencia de la aplicación de herramientas y técnicas de gestión de la calidad y de riesgos en el proyecto de estabilización de ladera del Rímac, en la vía de acceso al túnel San Martín, Distrito del
Rímac, Lima Metropolitana. Tesis Presentada para optar el título profesional de ingeniero civil. Universidad de San Martín 216p Disponible en: http://repositorio.unsm.edu.pe/handle/11458/2569 [Consultado el 17 de julio del 2018]
Smith, Nigel J., Tony Merna, Paul Jobling (2014). Managing risk in construction projects. Jonh Wiley and Sons, Ltd. Third edition, 238EE
Standards Australia/Standards New Zealand Standard Committee, AS/NZS- ISO 31000 (2009). Risk management Principles and guideline. Standards Australia/Standards New Zealand.Standard Committee, Sidney. Disponible en: https://shop.standards.govt.nz/catalog/31000:2009%28AS|NZS%20ISO%29/scope [Consultado el 17 de julio del 2018]
Vega de la C., (2017). Procedimiento con enfoque multicriterio para la gestión de riesgos. Caso: Hospital General Provincial “Vladimir Ilich Lenin”. Tesis presentada en opción al título de Master en Matemática Aplicada e Informática para la Administración, Universidad de Holguín, Cuba, 98p
Published
Issue
Section
License
Copyright (c) 2021 Revista Científica de FAREM-Esteli
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.